February 6th update

We’ll start a 2-storey property with pool.

In December/January we’ll to build this property for our customer from the US.

We keep in touch.

January 6th the first activity for to prepare the basic for the 2-storey property.

January 10th update

January 11th 2021

January 14/16th

January 20th

January 22sd update

January 24th update

January 26th update

January 29th update,

Pile foundation system of the pool

February 2sd update

February 6th update

February 10th update

February 15th steel installation of the pool

March 17th update

Roof construction

Today we’ll to start with the roof construction, temperature at 3pm 35 degree Celsius.

Roofs take quite a beating. Fully faced toward the sky, they catch the brunt of weather’s worst. They have to be able to take a licking and keep from leaking. They must be weathertight, secure, durable, attractive, and elastic enough to withstand severe temperature shifts without cracking.

March 28th update Roof construction

We’ll start to build a wall around the compound with an entrance.

February 2sd update

February 6th update

February 10th update of our compound wall

March 28th update of our compound wall

Deep well drilling

Drilling Your Own Well,
A water well is much more than a hole in the ground. To prevent groundwater contamination, a well constructor must use proper methods and equipment. Licensed and bonded water-well constructors have the equipment, knowledge, and experience required for proper well construction. For this reason, most states discourage landowners from drilling a well themselves. If a landowner decides to drill, alter, or abandon a well on his own property, he should first consult with the local regulating authorities to become familiar with specific construction requirement for the area.

for proper well construction. For this reason, most states discourage landowners from drilling a well themselves. If a landowner decides to drill, alter, or abandon a well on his own property, he should first consult with the local regulating authorities to become familiar with specific construction requirement for the area.